Exemples de chantiers où les additifs Veleton ont été utilisés

Plus de 300 chantiers dans différents pays. Chaque cas est un résultat concret, avec des indicateurs mesurables de résistance à l'orniérage et un retour sur investissement pour le maître d'ouvrage.

Pays
Astana, Kazakhstan, Turan Avenue (SMA-20 with Veleton MPC)
Astana

Astana, Kazakhstan, Turan Avenue (SMA-20 with Veleton MPC)

Type
Central arterial road with very high traffic and pavement overheating
Problem
Annual milling of the surface course due to overheating above 65 °C and intensive loads
Solutions / technology
Veleton MPC, dry addition into SMA-20
Result with Veleton
Over 2 years without medium repair instead of annual milling; stable surface course under monitoring by KazDorNII
Rut depth / key indicator
0.96 mm / 20,000 passes
Effect on the budget
Over 500,000 USD a year for the municipal budget
Additional effect
Fewer closures of the central arterial road and less congestion caused by repair works
Tbilisi, Georgia, I. Chavchavadze Avenue (A / MZ A-20 with Veleton MPC)
Tbilisi

Tbilisi, Georgia, I. Chavchavadze Avenue (A / MZ A-20 with Veleton MPC)

Type
Heavily loaded urban arterial road with bus lanes and zones of intensive braking
Problem
After the 2021 major repair with SMA-20, rutting appeared on the bus lanes twice a year; the pavement was replaced, but the problem could not be resolved
Solutions / technology
Veleton MPC, dry addition into type A / MZ A-20 asphalt
Type of mixture
Originally SMA-20 with modified binder; finally A / MZ A-20 with Veleton MPC
Result with Veleton
As of 2026 no rutting is observed, there are no pavement defects, and repeat repairs are not required
Service load
Round-the-clock traffic of buses weighing from 16 tonnes
Production effect
Within a month the asphalt plant gave up ready-made modified bitumen entirely and moved to modifying on its own
Effect on the budget
Bitumen costs fell by 14%; annual repairs were eliminated and budget costs considerably reduced
Kyiv, Ukraine, Vozdukhoflotsky Avenue and Vasiliya Lipkovskogo Street (A-40 and A-20 asphalt mixture with Veleton MPC)
Kyiv

Kyiv, Ukraine, Vozdukhoflotsky Avenue and Vasiliya Lipkovskogo Street (A-40 and A-20 asphalt mixture with Veleton MPC)

Type
Combined modification of the lower and the surface course on heavily loaded urban sections
Problem
Rutting, potholes, cracking and deformation on sections with high traffic loads, a difficult road profile and intensive braking
Solutions / technology
Veleton MPC, 2.5 and 2.0 kg/t, dry addition + energy-saving additive
Type of mixture
A-40 asphalt mixture, coarse-grained lower course; A-20 asphalt mixture, surface course
Process parameters
Mixing 15 seconds; loading 175 °C; paving 165 °C; around 5 hours before paving
Result with Veleton
The pavement has stayed in excellent condition after 5 years in service
Condition after the audit
No cracking or rutting; local deformation is visible only in the braking zone ahead of the traffic lights on Vozdukhoflotsky Avenue
Additional effect
The energy-saving additive kept the mixture workable in autumn with around 5 hours before paving
Tashkent, Uzbekistan, Rustaveli Avenue (Bus Lane, SMA-20 with Veleton MPC)
Tashkent

Tashkent, Uzbekistan, Rustaveli Avenue (Bus Lane, SMA-20 with Veleton MPC)

Type
Dedicated bus lane carrying extremely high loads
Problem
Rutting caused by heavy public transport traffic and by the pavement heating to +70 °C
Solutions / technology
Veleton MPC, dry addition into SMA-20
Result with Veleton
Over 300% higher rutting resistance on a section carrying increased bus loads
Rut depth / key indicator
1.45 mm / 20,000 passes
Effect on the budget
Over 500,000 USD a year freed up for the city akimat
Additional effect
The technology has been recommended by the Uzavtoyul road authority for large-scale rollout on sites carrying increased loads
Almaty, Kazakhstan, Tole Bi Street (dedicated public transport lane, A-40 + SMA-20 with Veleton MPC)
Almaty

Almaty, Kazakhstan, Tole Bi Street (dedicated public transport lane, A-40 + SMA-20 with Veleton MPC)

Type
Dedicated public transport lane with extremely high traffic
Problem
The pavement was breaking up 3-4 times faster than normal; overheating to +68 °C; two repairs a year
Solutions / technology
Veleton MPC, dry addition into A-40 and SMA-20
Result with Veleton
Over 2 years without repairs instead of two millings a year
Rut depth / key indicator
1.05 mm / 20,000 passes; rutting resistance up by 300%
Effect on the budget
300,000 USD a year freed up; return on investment of 200-300% over 2-3 years
Additional effect
A stable pavement on the bus lane under extreme loads and summer overheating to +68 °C
Kyiv, Ukraine, Verbovaya Street (autumn paving with liquid Veleton ESA)
Kyiv

Kyiv, Ukraine, Verbovaya Street (autumn paving with liquid Veleton ESA)

Type
Autumn paving at reduced air temperature
Problem
Working at +8 °C normally requires the mixture to be discharged at 170 °C, which increases fuel consumption
Solutions / technology
Liquid Veleton ESA, dosage 1%
Result with Veleton
The mixture was discharged at 140 °C and laid at 120 °C with no loss of compactability
Rut depth / key indicator
Discharge temperature lowered by 30 °C; 2,400 kg of fuel freed up per 1,000 t of mixture
Effect on the budget
2,400 USD per 1,000 t of mixture at a fuel price of 1 USD/kg
Additional effect
Working at +8 °C without overheating the mixture and with compaction quality retained
Astana, Kazakhstan, Mangilik El Avenue (central arterial road to the airport, using dry addition of the Veleton MPC additive)
Astana

Astana, Kazakhstan, Mangilik El Avenue (central arterial road to the airport, using dry addition of the Veleton MPC additive)

Type
Urban artery with intensive traffic, running towards the airport
Problem
Frequent repairs and rutting caused by pavement overheating and high traffic loads
Solutions / technology
Veleton, dry addition into the asphalt mixer
Result with Veleton
Almost 3 construction seasons without medium repair; stable surface course
Rut depth / key indicator
1.3 mm / 20,000 passes
Effect on the budget
350-400 thousand USD a year for the city budget
Additional effect
Introduced without stopping the plant, without changing the contractor's logistics and without separate PMB production
Odessa Region, Ukraine, R-70 highway, Belgorod-Dnestrovsky – Monashi section
Odessa Region

Odessa Region, Ukraine, R-70 highway, Belgorod-Dnestrovsky – Monashi section

Type
Regional road with intensive traffic
Problem
The need to increase the adhesion and rutting resistance of the asphalt
Solutions / technology
Veleton adhesion additive + AVE18 polymer, combined modification
Result with Veleton
Improved adhesion, a stable mixture, simpler work at the asphalt plant
Rut depth / key indicator
30-40% less labour; +2-3 years to the service life of the pavement
Effect on the budget
Up to 150,000 USD freed up over the service period
Additional effect
One operator instead of two when adding the adhesion additive; faster modification through the mill
Astana, Kazakhstan, Tauelsizdik Avenue (SMA-20 with Veleton MPC)
Astana

Astana, Kazakhstan, Tauelsizdik Avenue (SMA-20 with Veleton MPC)

Type
Urban arterial road with peak loads, stop-start driving, bus stop and turning zones
Problem
Shear deformation and shoving at bus stops, junctions and pedestrian crossings under summer pavement heating
Solutions / technology
Veleton MPC, dry addition into SMA-20 at the asphalt plant
Result with Veleton
Over 10,000 t of modified asphalt mixture; the pavement remains stable, with no corrugation, shoving or shear deformation.
Rut depth / key indicator
1.5 mm / 20,000 passes
Effect on the budget
120-180 thousand USD a year on local repairs
Additional effect
Higher shear resistance and thermal stability of the pavement under stop-start driving
Kyiv, Ukraine, Mykhaila Boichuka Street (MZ A-20 with Veleton MPC)
Kyiv

Kyiv, Ukraine, Mykhaila Boichuka Street (MZ A-20 with Veleton MPC)

Type
Urban street with intensive traffic, major repair
Problem
Rutting and cracking, the need for major repair
Solutions / technology
Veleton MPC, dry addition into MZ A-20, bitumen 50/70
Result with Veleton
250-300% expected gain in rutting resistance; positive feedback from the contractor
Rut depth / key indicator
Projected rutting resistance 2.5-3 times higher than the unmodified mixture
Effect on the budget
Up to 200,000 USD freed up over the first 3 years
Additional effect
A stable mixture during paving: even compaction with no “melting” effect
Astana, Kazakhstan, Moskovskaya Street (SMA-20 with Veleton MPC)
Astana

Astana, Kazakhstan, Moskovskaya Street (SMA-20 with Veleton MPC)

Type
Urban street with stop-start driving: parking, schools, service zones
Problem
Shoving, waves and local deformation at bus stops, crossings and junctions
Solutions / technology
Veleton MPC, dry addition into SMA-20
Result with Veleton
Over 2 seasons without medium repair; stable condition of the sections carrying increased loads.
Rut depth / key indicator
1.5-1.6 mm / 20,000 passes
Effect on the budget
120-180 thousand USD a year on patch repairs
Additional effect
Pavement stability in braking zones, pulling-away zones and local peak load zones
Odessa, Ukraine, entrance from the M14 highway (repair of a heavily loaded section with Veleton MPC)
Odessa

Odessa, Ukraine, entrance from the M14 highway (repair of a heavily loaded section with Veleton MPC)

Type
City entrance with constant heavy goods traffic
Problem
Intensive rutting, frequent braking and the need to complete the repair within the 10:00-22:00 thermal window
Solutions / technology
Veleton MPC, dry modification of the mixture in small batches to match the paving
Result with Veleton
The section was restored and opened to heavy traffic the same day
Rut depth / key indicator
Rutting resistance increased 3 times compared with the ordinary mixture
Effect on the budget
Up to 20,000 USD on each comparable site by doing away with storing and heating PMB
Additional effect
The ability to produce 2-5 truckloads of modified mixture to match the paving under way, without modifying the bitumen beforehand
Astana, Kazakhstan, Tlendiyeva Street (A-40 + SMA-20 with Veleton MPC)
Astana

Astana, Kazakhstan, Tlendiyeva Street (A-40 + SMA-20 with Veleton MPC)

Type
Section with extreme loads: braking lane for heavy goods vehicles
Problem
At least 2 repairs a year due to peak axle loads and deep rutting
Solutions / technology
Veleton MPC, dry addition into the A-40 lower course and the SMA-20 surface course
Result with Veleton
Over 2 years without medium repair; a considerable increase in pavement stability
Rut depth / key indicator
+70-90% in compressive strength compared with conventional modification
Effect on the budget
Over 250,000 USD freed up for the Astana budget
Additional effect
The durability of the braking section increased 6.3 times
Chernivtsi, Ukraine, Nezalezhnosti Avenue, ZakhidDorBud asphalt plant (MZ B-10 with Veleton MPC)
Chernivtsi

Chernivtsi, Ukraine, Nezalezhnosti Avenue, ZakhidDorBud asphalt plant (MZ B-10 with Veleton MPC)

Type
Production of modified asphalt mixture under unstable power supply
Problem
Limited operating time at the asphalt plant, only four truckloads of mixture produced, and no way to modify the bitumen safely
Solutions / technology
Veleton MPC, 2.5 kg/t, dry addition into MZ B-10
Result with Veleton
A stable production run and figures above the DSTU requirements even with a restricted power supply
Rut depth / key indicator
R50: 1.90 MPa at the plant, 2.37 MPa from the paver, average 2.13 MPa against a requirement of no less than 1.8 MPa
Effect on the budget
Not calculated
Additional effect
The section came through the winter service period of 2025-2026 with no cracking, rutting or other pavement defects
Sumy Region, Ukraine, R-44 highway (SMA with Veleton ESA + AVE18)
Sumy Region

Sumy Region, Ukraine, R-44 highway (SMA with Veleton ESA + AVE18)

Type
Major repair in low-temperature conditions
Problem
Risk of losing 3,000 t of SMA to frost, long haulage and 6 hours of standing time
Solutions / technology
Veleton ESA + AVE18, combined modification
Result with Veleton
The whole 3,000 t batch laid with no write-off; workability retained after the standing time
Rut depth / key indicator
172 °C after 6 hours standing at -2 °C
Effect on the budget
A batch worth 24.9 million UAH / 604,000 USD saved
Additional effect
A wider working paving window in frost, with long haulage and delays at the site
Kharkiv Region, Ukraine, Martovoe (major repair of a highway with SBS-modified bitumen)
Kharkiv Region

Kharkiv Region, Ukraine, Martovoe (major repair of a highway with SBS-modified bitumen)

Type
Major repair of a highway section with intensive traffic
Problem
Pronounced rutting, a network of cracks, reduced comfort and safety of traffic
Solutions / technology
SBS-modified bitumen, 3.2% SBS
Result with Veleton
Paving went without any issues, the pavement showed an even structure and high compactability
Rut depth / key indicator
Projected increase in service life of up to +40-50% relative to unmodified asphalt
Effect on the budget
Up to 100,000 USD over the life cycle of the section through reduced medium repair costs
Additional effect
Higher elasticity, crack resistance and resistance of the surface course to rutting
Odessa Region, Ukraine, M13 highway, section from Okny to the border (pothole repair with Veleton MPC)
Odessa Region

Odessa Region, Ukraine, M13 highway, section from Okny to the border (pothole repair with Veleton MPC)

Type
Pothole repair of a road with periodic heavy vehicle traffic
Problem
Potholes, surface breaks, deformation and the absence of any major repair, on a limited budget
Solutions / technology
Veleton MPC, dry addition into the asphalt mixture
Result with Veleton
The 2023 repair is still serviceable as of 2025
Rut depth / key indicator
The interval between repairs increased at least 3-4 times
Effect on the budget
Up to 80,000 USD freed up on repeat repairs for a section of this length
Additional effect
Pothole repair with Veleton MPC became a durable solution for a section where no major repair was planned
Uman, Ukraine, access roads to a chemical plant (MZ B-10 with Veleton MPC)
Uman

Uman, Ukraine, access roads to a chemical plant (MZ B-10 with Veleton MPC)

Type
Industrial access road carrying heavy goods vehicles
Problem
The need to increase the durability of the pavement on a limited budget and without conventional bitumen modification
Solutions / technology
Veleton MPC, dry addition into MZ B-10; dosage 2.4 kg/t
Result with Veleton
The mixture was laid without any issues and showed good compactability and a stable working temperature
Rut depth / key indicator
Mixture discharge at 169-175 °C; paving at 160 °C; projected increase in service life of 2-2.5 times
Effect on the budget
Up to 15-20% of the budget at the repair stage; potentially up to 40-50 thousand USD over the life cycle of the road
Additional effect
Polymer modification of the asphalt mixture by the dry-input method, without bitumen modification
Lozovaya, Ukraine, production of MZ B-10 with Veleton MPC for paving in Pavlograd
Lozovaya

Lozovaya, Ukraine, production of MZ B-10 with Veleton MPC for paving in Pavlograd

Type
Trial run of the modified mixture with control of haulage, paving and compaction
Problem
The need to verify the stability of MZ B-10 with MPC without modifying the bitumen beforehand
Solutions / technology
Veleton MPC, dry addition into MZ B-10; dosages of 3 kg/t and 2.5 kg/t
Result with Veleton
The mixture showed excellent compactability, consistent quality and retained its working temperature
Rut depth / key indicator
Projected increase in rutting resistance of up to 250% relative to unmodified pavement
Effect on the budget
Not calculated
Additional effect
The run went without difficulty, without changing the asphalt plant's logistics and without modifying the bitumen beforehand
Kyiv, Ukraine, Severny Bridge (A-20 surface course with Veleton MPC)
Kyiv

Kyiv, Ukraine, Severny Bridge (A-20 surface course with Veleton MPC)

Type
Urban arterial road with extreme traffic
Problem
Annual repairs and rutting with the pavement heating to +65 °C
Solutions / technology
Veleton MPC, dry addition into A-20
Result with Veleton
3 years without defects instead of annual repairs
Rut depth / key indicator
≤1.5 mm / 20,000 passes
Effect on the budget
Payback in 2 years; around 200,000 USD a year freed up thereafter
Additional effect
A reduced need for annual intervention on a key transport artery of Kyiv
Kyiv, Ukraine, Stolichny asphalt plant, Ostrovnaya Street (access road with Veleton MPC)
Kyiv

Kyiv, Ukraine, Stolichny asphalt plant, Ostrovnaya Street (access road with Veleton MPC)

Type
Access road to an asphalt plant with constant goods vehicle traffic
Problem
High loads from goods vehicles with no proper road foundation in place
Solutions / technology
Veleton MPC, 2.5 kg/t
Result with Veleton
5 years in service with no cracking or rutting
Rut depth / key indicator
2026 audit: no cracking, no rutting
Effect on the budget
Not calculated
Additional effect
One of the first sites using Veleton MPC, confirming the durability of the pavement under difficult service conditions
Kyiv, Ukraine, Solomenskaya Square (major repair of the road and the intersection with Veleton MPC)
Kyiv

Kyiv, Ukraine, Solomenskaya Square (major repair of the road and the intersection with Veleton MPC)

Type
Urban road and intersection, major repair
Problem
High urban loads, risk of rutting and deformation at the intersection
Solutions / technology
Veleton MPC used to modify the surface course and the lower course
Result with Veleton
Pavement in excellent condition according to the 2026 audit; no cracks or deformation
Rut depth / key indicator
1.84 mm against a limit of 4 mm
Effect on the budget
Not calculated
Additional effect
The planned service life increased 3 times
Podryad asphalt plant, test section comparing Veleton SBS and Veleton MPC
Podryad asphalt plant

Podryad asphalt plant, test section comparing Veleton SBS and Veleton MPC

Type
Comparative test section in long-term service
Problem
The need for a practical comparison of two modification technologies under identical conditions
Solutions / technology
Veleton SBS and Veleton MPC
Result with Veleton
7 years in service with no cracking or rutting
Rut depth / key indicator
2025 audit: both sections in good condition, no significant defects found
Effect on the budget
Not calculated
Additional effect
The effectiveness of both Veleton solutions confirmed in long-term service