Veleton
Kyiv, Ukraine, Solomenskaya Square (major repair of the road and the intersection with Veleton MPC)
Kyiv · Major repair

Kyiv, Ukraine, Solomenskaya Square (major repair of the road and the intersection with Veleton MPC)

Besoin

A major repair of the road and the intersection was carried out in the area of Solomenskaya Square in Kyiv. The site is among those with intensive urban traffic, high loads on the pavement and regular braking, lane-changing and turning zones.

The task was to increase the resistance of the pavement to rutting and deformation by using an asphalt mixture modified with Veleton MPC.

Solution Veleton

Modification of the asphalt mixture with Veleton MPC was applied at the site. At the time the works were carried out, the mixture for the lower course was produced with a dosage of 2.5 kg/t. The surface course was subsequently planned to be laid as continuous pavement, also using MPC modification.

Samples had been taken earlier for this solution and returned a high result for rutting resistance: 1.84 mm against a limit of 4 mm.

Interventions Veleton sur chantier

Veleton specialists provided an audit of the materials and application conditions, selection and adjustment of the mixture composition, determination of the Veleton MPC dosage, control of the use of the modified mixture, support of mixture production for the lower course, preparation of the solution for the subsequent surface course, sampling for testing and the follow-up audit of the pavement condition in 2026.

Le résultat en chiffres

The rut depth in testing was 1.84 mm against a limit of 4 mm. The actual figure is more than 2 times better than the limit.

According to the 2026 audit the pavement is in excellent condition: no cracks, deformation or other defects.

Effet supplémentaire

The 2026 audit confirmed that the section fully meets expectations for a well-executed site with modified asphalt. The case matters because it carries not only a laboratory result for rutting but also actual confirmation of the pavement's condition after the site was completed.

Effet pour le budget

Not calculated. The main confirmed effect is a rutting result more than 2 times better than the limit, and excellent pavement condition according to the 2026 audit.

Paramètres du chantier
Kyiv · 2025
Contractor
PP Avtomagistral
Period of works
Summer 2025
Site audit
2026
Type of works
Major repair of the road and the intersection
Type
Urban road and intersection, major repair
Problem
High urban loads, risk of rutting and deformation at the intersection
Solutions / technology
Veleton MPC used to modify the surface course and the lower course
Result with Veleton
Pavement in excellent condition according to the 2026 audit; no cracks or deformation
Rut depth / key indicator
1.84 mm against a limit of 4 mm
Effect on the budget
Not calculated
Additional effect
The planned service life increased 3 times
Avant et après

4 photos