Besoin

The repair of the section of the R-70 highway had to increase the durability of the pavement: to provide firm adhesion of the bitumen to the aggregate and at the same time to increase the rutting resistance of the asphalt through polymer modification.

Solution Veleton

Combined modification was carried out at the client's asphalt plant. The Veleton adhesion additive, at a dosage of 0.4% by weight of the bitumen, was added directly into the tank from above, which proved more convenient and more accurate than the traditional route through an intermediate bucket.

The AVE18 polymer additive was used to modify the MZ/B-20 mixture. The plant used a colloid mill, which speeded up the process and made the result consistent, although the standard scheme needs only 175 °C, 2 hours and ordinary agitators.

Interventions Veleton sur chantier

Veleton specialists provided an audit and selection of the optimal additive dosages, support of the modification at the asphalt plant, control of the temperature regimes and of the quality of the mixture produced, and sampling of the bitumen and the mixture for further laboratory testing.

Le résultat en chiffres

Good adhesion of the bitumen to the aggregate was confirmed by the absence of any issues with the samples.

The labour involved in the dosing operations was reduced by 30-40%.

The projected increase in the service life of the pavement is 2-3 years thanks to the combined modification.

Effet supplémentaire

The client gained a more convenient process for adding the adhesion additive: one operator instead of two. Modification time was also reduced by using AVE18 through the mill, and the pavement gained both improved adhesion and increased resistance to loads.

Effet pour le budget

The expected funds freed up on repairs are up to 150,000 USD over the service period of the section.

“Combined modification with Veleton and AVE18 gives us both firm bonding and pavement resistance to loads. And the work at the plant has become more convenient and faster.”

Paramètres du chantier
Odessa Region · 2022
Type
Regional road with intensive traffic
Problem
The need to increase the adhesion and rutting resistance of the asphalt
Solutions / technology
Veleton adhesion additive + AVE18 polymer, combined modification
Result with Veleton
Improved adhesion, a stable mixture, simpler work at the asphalt plant
Rut depth / key indicator
30-40% less labour; +2-3 years to the service life of the pavement
Effect on the budget
Up to 150,000 USD freed up over the service period
Additional effect
One operator instead of two when adding the adhesion additive; faster modification through the mill