Veleton
Veleton polymer solutions

The road budget stops funding constant restoration and becomes an instrument of development.

Conventional pavement
With Veleton solutions
3–4×

The same budget works several times longer.

years of expertise
20+
sites in various countries
300+
days on site each year
200+
asphalt plants work with Veleton technologies
100+
tonnes of polymers applied
130 000+
state laboratory test reports
300+
The system's daily pain

From the level of the fresh mat: a roller at the edge of the laid asphalt, a tipper and a paver working ahead

Repairs instead of development

Funds go back into sections that have already been built instead of expanding and modernizing the road network.

Materials are becoming less predictable

Unstable bitumen properties reduce control over the result even where formal requirements are met.

Loads keep growing

Traffic intensity, axle loads and climatic exposure are growing faster than the resistance of the pavement.

The state is left with the consequences

The contractor hands over the site, but the state carries the cost of defects, repeat repairs and public discontent.

A cheap solution today often becomes the most expensive one across the life cycle of the road.

Impact for the state

A multi-lane carriageway with fresh markings under a flyover

A site where Veleton additives were used, Georgia

Budget

Budget is freed up for new sites

Fewer repeat repairs mean more funds for roads, bridges, interchanges and regional infrastructure.

Investment

Higher return on investment

Longer-lasting roads increase the result the state receives from one and the same budget.

Horizon

Planning over 5–10 years, not one season

Predictable maintenance intervals make it possible to build a works programme several years ahead and to plan the load on asphalt plants and contractor capacity, instead of rewriting the plan every spring around emergency pothole repairs.

Governance

Roads as a measure of state performance

Resilient infrastructure becomes visible proof that public investment delivers a long-term result.

Financing

Stronger protection for budgets and programmes

When roads last longer, it is easier for the state to justify new infrastructure budgets and to attract financing.

Economy

A faster economy through resilient logistics

Reliable roads reduce transport costs, support trade and strengthen connectivity between regions.

Society

Lower public and political pressure

Fewer repeat failures, traffic restrictions and complaints mean higher trust in the work of state institutions.

Reputation

A stronger reputation for the country

A modern infrastructure policy strengthens the investment image of a country and demonstrates maturity in public administration.

Durable solutions create an effect that lasts longer than a single administrative cycle.

Figures you can verify

The Veleton calculator compares more than the initial cost of the mixture. It accounts for future repairs, the service life of the road and the total burden on the budget over a horizon of 5, 10 or 15 years.

3.0million USD

of funds freed up per 10 km of road over 10 years

The baseline scenario of the Veleton calculator. The result changes with the cost of works, the road parameters and the service life selected.

300+million USD

of funds potentially freed up at a scale of 1,000 km / 10 years in the same calculation scenario.

Less money returns into repeat repairs, more remains available for developing the road network.

The calculated result depends on local prices, the pavement structure, the number of modified layers, the service life and the period selected. The calculator makes it possible to change these parameters and to produce a calculation for internal approval.

The unique Veleton approach

The key to success is the Veleton approach, unique in the industry: full and continuous technical support at plants and on site.

A Veleton technologist supporting paving on site together with the contractor's crew

Managed execution

The state receives a controlled process at every stage, not dependence on the discipline of an individual contractor.

Control of the entire production chain

Veleton brings the laboratory, production, transport and paving together into one technological system.

Less influence from the human factor

Critical parameters are recorded, and deviations are identified before they become pavement defects.

Fast correction of deviations

The mix design and the production regimes are adjusted during implementation itself.

Consistent quality across the whole site

The result is controlled not on a single laboratory sample, but along the full length of the pavement.

A reproducible result

A successful technological model transfers to the next sites, regions and production teams.

Continuous technical backing

The state client and the contractors are not left alone with the works on site

Less operational load on the contractor

Veleton takes on the coordination of the key technological stages and helps prevent problems before they appear.

We build a system in which the technology works consistently from site to site, delivering a high and stable result.

Technical support at every stage
  1. 01

    Analysis of the input components

    The actual properties of the bitumen and the mineral materials.

  2. 02

    Mix design selection and testing

    Adaptation to local materials, climate and traffic loads.

  3. 03

    Setting the production regimes

    Dosing, order of addition, temperature and mixing time.

  4. 04

    Control of transport and paving

    Keeping the working properties of the mixture until compaction is complete.

  5. 05

    Technologist support on site

    Control of implementation, prompt adjustment and support for the team.

Managed implementation

  1. Adaptation to local conditions

    The solution is tuned to the bitumen, climate, loads, applicable standards and production capabilities of the country.

  2. A controlled process

    The project targets are agreed in advance, and production and paving run with full Veleton support.

  3. Recording the working model

    Implementation produces mix designs, method statements, instructions and a control system.

  4. Scaling

    The confirmed model transfers to the next sites, regions and contracting organizations.

The technology stops being a one-off and becomes a managed state process.

Discuss a project
An interchange at night from above: lit lanes and slip roads

One of the main arteries of Tbilisi. The paving was done with Veleton polymer solutions

A result that outlasts one site

A stronger contractor

The contractor receives a clear technology, continuous support and the readiness to work on demanding sites.

Fewer defects and repeat repairs

Errors are prevented during production and paving, not corrected after the road has failed.

Higher quality requirements

The market is gradually moving from lowest-price logic to assessing durability and life-cycle cost.

The result depends less on specific people

Recorded processes and method statements make it possible to reproduce quality when a team or a contractor changes.

Less load on specialist staff

Veleton takes on technical support for the contractor, so specialists on the state side spend less time on day-to-day production problems.

The state receives more than a technology: it receives an effective technological partner that steadily improves the efficiency of road construction and repair.

Applied in real conditions

Sites where Veleton solutions were used

Urban arterials, international roads and sections with high traffic and temperature loads.

Astana, Kazakhstan, Turan Avenue (SMA-20 with Veleton MPC)
Astana

Astana, Kazakhstan, Turan Avenue (SMA-20 with Veleton MPC)

Type

Central arterial road with very high traffic and pavement overheating

Problem
Annual milling of the surface course due to overheating above 65 °C and intensive loads
Solutions / technology
Veleton MPC, dry addition into SMA-20
Result with Veleton
Over 2 years without medium repair instead of annual milling; stable surface course under monitoring by KazDorNII
Rut depth / key indicator
0.96 mm / 20,000 passes
Effect on the budget
Over 500,000 USD a year for the municipal budget
Impact for the country

Moving to longer-lasting roads gives the state more result for the same budget, reduces dependence on repeat repairs and creates a basis for the long-term development of the road network.

A road interchange from above: a roundabout with dedicated lanes and traffic in both directions

Completed using Veleton polymer solutions

Systemic development of a country's infrastructure begins with the ability to look beyond a single repair and budget cycle.

  • Repeat repairs keep the current system running, but they do not solve the problem of its durability or of the growing burden on the budget.

Next step

The Veleton team will prepare materials for the tasks facing the road construction industry in your country.

Preferred way to get in touch

By submitting the form you agree to your data being processed in line with the privacy policy.