Veleton adapts polymer solutions to your materials, your production and your site, and supports the process from the laboratory to paving.
More than an additive. A working technological system at the plant and on site.

We work together on the key problems of the industry
Unstable materials
The bitumen and the components of the mixture change from batch to batch, while responsibility for the final quality stays with you.
Too many critical points
Mix design, dosing, temperature, logistics, paving and compaction: an error at one stage can ruin the entire result.
Deadlines leave no room for error
A short season, a tight schedule and changing weather turn any disruption into downtime, cost overrun or extra work.
Key specialists are working at the limit
The technologists and the laboratory are responsible at the same time for raw materials, mix designs, production, control and problems on site.
In road construction an error rarely stays technical: it quickly becomes financial.
The key to durable results is full and continuous technical support at plants and on site.
A mix design for your conditions
The solution is adapted to the actual properties of the bitumen, the aggregates, the equipment and the site.
A technologist beside you at the critical points
Veleton helps with mix design selection and with setting additive addition, temperature, mixing, discharge, transport and paving.
Deviations are corrected as work goes on
Problems are found and corrected before they become rejected material, a claim or a cause of financial loss.
A repeatable result
After start-up the team keeps the working regimes, the method statements, the experience for the next sites and continuous support from Veleton technologists.

| Production task | What Veleton does | Result for the business |
|---|---|---|
| Unstable bitumen and raw materials | Adapts the mix design to the actual materials | Result for the businessA stable mixture |
| A highly sensitive process | Sets dosing, temperatures and regimes | Result for the businessFewer random deviations and manual corrections |
| A gap between the laboratory and the site | Links technology, production, logistics and paving | Result for the businessOne managed process instead of separate, uncoordinated stages |
| Risk of rejects and losses | Controls the critical points of start-up and execution | Result for the businessFewer defects, less downtime and lower financial losses |
| Overloaded staff | Brings in an external technology team | Result for the businessLess crisis load on the key specialists |
| A difficult first start-up | Supports production and the site | Result for the businessFaster to a stable working regime |
| Strict client inspection | Helps keep to the regimes and reach the result | Result for the businessEasier to pass tests and to defend quality |
| Demanding sites | Adapts the technology to the requirements and conditions | Result for the businessGreater readiness for projects with higher requirements |
- 01
Task analysis
We define the requirements of the site, the production constraints and the main risks.
- 02
Analysis of materials and equipment
We examine the bitumen, the mineral components, the mix design, the dosing and the discharge regime.
- 03
Selecting the solution
We choose the technology and the application parameters for the specific conditions.
- 04
Setting the working regime
We fix the mix designs, the temperatures, the regimes and the discharge of the mixture.
- 05
Work at the plant and on site
A technologist supports the critical stages, where the risk of losing the result is highest.
- 06
Testing and adjustment
We check how the mixture behaves and adjust the working regime where necessary.
- 07
Recording the result
The team receives the technological parameters, the conclusions and recommendations for the next sites.
Less rejected material and rework
Errors are prevented before they lead to writing off a mixture or repeating the works.
Less downtime
A clear start-up regime reduces the likelihood of stoppages and chaotic corrections.
Less overconsumption
A stable process reduces the need to nurse the mixture along by hand during production.
Fewer claims
Managed production and paving reduce the warranty and reputational burden.
Less dependence on manual heroics
The result rests on a system, not only on a few overloaded specialists.
Significant losses are often invisible in the cost estimate: downtime, disputed batches, missed schedules and lost trust.
Stronger price protection
A stable and confirmed result makes it possible to argue the value of the solution instead of reducing negotiations to the price per tonne.
Access to more demanding sites
Technological readiness strengthens your position in projects with high loads, strict inspection and difficult conditions.
Higher client trust
Managed production and a transparent evidence base strengthen a reputation as a reliable contractor.
More repeat opportunities
High results site after site increase the likelihood of long-term relationships and open the way to further orders.
Scaling into new regions
A proven technological model is easier to transfer to other plants, sites and production teams.
A strong contractor does not earn on production capacity alone. It earns on trust, predictability and engineering credibility.

Completed using Veleton polymer solutions
For the production manager
Less unpredictability and more control over output.
For the chief technologist
Support in mix design selection, regime setting and correcting deviations.
For the laboratory
Clear parameters, tests and materials for further control.
For the paving crew
A workable mixture, clear regimes and support on site.
For the business owner
Fewer production risks, a stronger position with the client and higher profitability
Veleton steps in where the client's team needs additional experience most: when the raw materials change, when the technology is being tuned, in complex logistics or where a site sets higher requirements.
- years of expertise
- 20+
- sites in various countries
- 300+
- days on site each year
- 200+
- asphalt plants work with Veleton technologies
- 100+
- tonnes of polymers applied
- 130 000+
- state laboratory test reports
- 300+

Completed using Veleton polymer solutions
A clear application regime
Recorded parameters for repeating the process consistently.
Materials for the laboratory and for control
Tests, conclusions and recommendations you can keep working with.
A prepared team
Staff gain practical experience in raising quality.
A basis for the next sites
A proven model, ready to use on the sites that follow.
Access to Veleton technologists
Immediate support when the raw materials, the season, the site conditions or the client's requirements change.
Full and continuous technical support from the team of Veleton technologists at plants and on site
Veleton first analyses the existing equipment and constraints, and then selects a regime that can be built into the current production process.